




Arrived on a job site to install SFIC Medeco x4 core in a new addition to the building to match their existing system. The contractor had installed Corbin Russwin LFIC levers (instead of the specified SFIC). Contractor double checked his paperwork and said SFIC was ordered but apparently they received LFIC from the supplier. The average contractor/installer probably doesn't know the difference or could tell the difference, but I knew straight away when I saw it. I showed him the difference with an X4 SFIC. He said, "wow, damn it, wow". I said, "yeah, it's like throwing a hotdog down a hallway"... We both laughed. He is correcting the problem and I'll be back next week.